Heatsinks, cooling, thermal interface materials, enclosures and cabinets.
The shipment claim covers the rack and a wider cooling portfolio, but deployment still depends on the power, fluid and commissioning infrastructure around it.
The bench test passed, efficiency looked acceptable and the pin-compatible module fitted. In the assembled product, case temperature rises toward shutdown after twenty minutes. What would you check first?
The previous I²C fault is resolved, followed by a fictional sourcing problem involving a formally compatible MOSFET substitute.